Lead-free water for all: Making the case for rapid lead pipe removal across the U.S.

Boy drinking water from a fountain

This report from The Rockefeller Foundation includes six steps to scaling up equitable lead pipe replacement. It includes a case study of Newark’s lead service line replacement program and Trenton’s use of predictive modeling technology. The report mentions Jersey Water Works as a resource on page 39.